Learning The High Potential Of Earned Value

By Frank Jones


There are number of management tools for predicting the movements within a project in progress. One of the best and most used currently is a technique called earned value, a platform that integrates all relevant factors that will realistically plot performance levels. These factors include the calculated values for budgeting, fulfillment of timelines and resources management.

The values used must all be proven, both from previous company work to those now currently being accomplished. These are the parameters that create margins of safety with which to base the completion of future projects. Earned value OH uses what is called data trends to build both visual and quantified patterns that are predictive of any project, whether they represent plus or minus factors, they should be factored values given at the beginning.

It is a way of monitoring and comparing planning against work that has been done to see how actual work in succeeding days will be done. It also gives an idea of how the schedule is being fulfilled, whether it is on schedule, in advance of it, or behind it. The costing is factored in, and where there are overruns, adjustments are made as soon as possible, which is basically applied when the next step in the process is taken.

The levels of factors form a connected thread that form trends. Since there is a constant monitor for interconnected trends, the expert who manages the system will be able to call out the necessary adjustments to plan. Ideally, money spent and the timelines should match for a positive growth pattern. If this is so, then managers are assured of good progress.

The plus or minus factor is a given here. It is just like in a survey, where there is a plus or minus zone wherein the quality of the persons or items surveyed are on a more or less equivalent standing. A little over budget is not bad. A little short behind schedule is the same. These are offset from the start, where the plan prepares the executors for a set of possibilities concerning cost and timeline.

On any part of the program, there will be adjustments made. Scheduling and spending are adjusted so that the flow is made smoother. In earned value, management controls scope so schedules and the budget are field factors in constant movement.

The technique has a high degree of accuracy, which makes it a great resource. What the company has is maximized, often eliminating the logistical problems of handling more or less than the needed materials attached to any phase. It is a way streamlining the process.

Earned value also bridges the physical distance of management from the field. This is because of the constant monitoring and quantified updates provided. These help them make the most relevant and vital decisions that guides those who are physically accomplishing the work. With precise specifications and metrics, they can easily do scaling and projections. This technique is at its most effective when there are no uncontrolled factors involved.

Achieving goals is not an impossible task. But these goals present complex problems that, without applied management techniques, will not be on the horizon at all. For projects that should be done within safe corridors for budget, resources and climate concerns, earned value is the tool to use.